1.3 ACCOUNTING POLICIES

1.3.1. New accounting standards

1.3.1.a) New standards, amendments and interpretations adopted by the European Union mandatorily applicable for the first time in 2016.

On 1 January 2016, the following standards which might have an impact on the consolidated financial statements came into force in the European Union: Amendments to IAS 1, Disclosure Initiative; Improvements to IFRSs, 2012-2014 cycle; Amendments to IASs 16 and 38, Clarification of Acceptable Methods of Depreciation and Amortisation; and Amendments to IFRS 11, Accounting for Acquisitions of Interests in Joint Operations. None of these amendments had a significant impact on the consolidated financial statements for the year that began on 1 January 2016.

1.3.1.b) New standards, amendments and interpretations mandatorily applicable in annual reporting periods subsequent to 2016.

The new standards, amendments and interpretations approved by the IASB but not yet mandatorily applicable that might have an effect on the Group are as follows:

New standards, amendments and interpretations

 

 

Obligatory application in annual reporting periods beginning on or after:

Not yet applied but already approved for use in the EU

IFRS 15

Revenue from Contracts with Customers

1 January 2018

IFRS 9

Financial Instruments

1 January 2018

Not yet approved for use in the EU

IFRS 16

Leases

1 January 2019

Amendments to IAS 12

Recognition of Deferred Tax Assets for Unrealised Losses

1 January 2017

Amendments to IAS 7

Disclosure Initiative

1 January 2017

Clarifications to IFRS 15

Revenue from Contracts with Customers

1 January 2018

Amendments to IFRS 2

Classification and Measurement of Share-based Payment Transactions

1 January 2018

Annual improvements

2014-2016 cycle

1 January 2017/2018

IFRIC Interpretation 22

Foreign Currency Transactions and Advance Consideration

1 January 2018

Amendments to IAS 40

Investment Property

1 January 2018

Expected impacts on application of the most important standards:

IFRS 15. Revenue from Contracts with Customers

Although the standard is not mandatorily applicable until 2018, in view of its significance for the business activities in which Ferrovial operates, mainly Construction and Services, the Group has decided to early apply it in 2017. To this end, a plan has been launched featuring the following milestones:

  • After conducting an analysis of the standard in the last few months of 2016, Ferrovial developed a new internal policy with the aim of defining practical criteria for the application of IFRS 15 in all its business activities.
  • This was followed by a qualitative assessment and an initial quantification of the main changes that may arise from the new standard, as well as an analysis of the possible impacts on reporting systems.
  • Before the end of the first quarter of 2017, a more detailed quantification will be made of the effects of initial application, which will be accounted for retrospectively at the end of that quarter, recognising an adjustment in reserves to the opening balance at 1 January 2017 (“cumulative effect adjustment to equity”).
  • Lastly, these adjustments will be reviewed in greater detail by the auditors of the Group’s subsidiaries when they perform the limited review of the interim financial statements.

The main impacts identified relate basically to the following three issues:

  1. Definition of different performance obligations in long-term services contracts and allocation of a price to each obligation. These are mainly long-term contracts (more than ten years) in the Services Division in which Ferrovial carries out various different activities throughout the life of the infrastructure (Capex, Opex and Lifecycle). Currently, these contracts are regarded as having a single performance obligation, and the result thereof is recognised by reference to the overall profitability of the project. Under the new standard, unlike the above-mentioned method, several performance obligations will be recognised (IFRS 15.27), to which the prices established in the contract, provided they are deemed to be market prices, will be allocated (IFRS 15.73-80). The effect of this new criterion may be to delay the recognition of revenue, insofar as the expected margin on the performance obligations already satisfied will be lower than that forecast for the contract as a whole. The negative impact (net of tax) of this adjustment in reserves, according to an initial estimate, would amount to approximately EUR 70 million.
  2. Requirement of approval versus probability in the recognition of revenue arising from contract modifications and claims. Under IFRS 15 customer approval is required in order for such revenue to be recognised (IFRS 15.18), a stricter criterion than the probability requirement in the current IAS 11 and IAS 18. This change will give rise to a delay in the recognition of revenue, which can only be recognised when the customer has approved the contract modification, and not when it is probable that it will approve it. In the case of contract modifications or claims in which the customer has approved the revised scope of the work but the corresponding change in price has not yet been determined, revenue will be recognised for the amount with respect to which it is highly probable that a significant reversal will not occur in the future. The negative impact (net of tax) of this adjustment in reserves, according to an initial estimate, would amount to approximately EUR 60 million.
  3. Establishment of a consistent revenue recognition method for contracts with similar characteristics. The new standard requires a consistent revenue recognition method to be used for contracts and performance obligations with similar characteristics (IFRS 15.40). The Group has chosen the output method as its preference for measuring the value of assets or services of which control is transferred to the customer over time, provided that the progress of the work performed can be measured during the course of the agreement (IFRS 15.B17). In contracts to provide different highly interrelated goods or services in order to produce a combined output, which occurs habitually in contracts with a construction component, the applicable output method is that of measurement of units produced (“surveys of performance completed to date” output method). Also, in routine service contracts in which the goods or services are substantially the same and are transferred with the same pattern of consumption, in such a way that the customer receives and consumes the benefits of the goods or services as the entity provides them, the method selected by the Group to recognise revenue is the time elapsed (output method), whereas costs are recognised on an accrual basis. On the basis of the foregoing, the input method (based on resources consumed) will only be used when the progress of the work cannot be measured reliably. The use of this rule will give rise to a change of recognition method for certain projects, and the negative impact (net of tax) of this adjustment in reserves, according to an initial estimate, would be approximately EUR 30 million.

Based on the foregoing, the estimated net total negative adjustment arising from the first-time application of IFRS 15 amounts to approximately EUR 160 million. However, the precise quantification of this adjustment will depend on the achievement of all the aforementioned milestones, the tasks for which will be completed in the first six months of 2017.

The new standard will require the Group to review its internal processes and controls relating to revenue recognition. Although this review is already in progress, it has not yet been completed.

The reporting systems currently in place will be maintained, although the controls established in them will have to be adapted.

IFRS 9. Financial Instruments:

The impacts identified are less important than those of IFRS 15, since the entities most affected by IFRS 9 are financial institutions. The Company is analysing the possibility of applying the standard early, although it has not yet taken a decision in this respect.

Set forth below is a summary of the main impacts, following an initial analysis of the three phases of the standard:

  1. Hedge accounting. IFRS 9 attempts to align hedge accounting more closely with risk management, and the new requirements establish a principle-based approach. IFRS 9 permits the designation of specific components of non-financial items and the inflation risk component of financial instruments as hedged items, provided that they are separately identifiable and reliably measurable, and it has to be proved that there is a liquid market for the items concerned. The Group has identified a possible impact relating to the inflation-indexed derivatives arranged at HAH, which under IFRS 9 might meet the requirements for hedge accounting. Lastly, it should be noted that under the new standard it is possible to designate an aggregated exposure (including a derivative and another non-derivative component) as a hedged item, and to consider currency basis spreads as a cost of the hedge, which could have an impact on the derivatives arranged by HAH.
  2. Impairment of financial assets. IFRS 9 replaces the incurred loss model of IAS 39 with a model based on expected credit losses. Under the new standard, the loss allowance for a financial instrument will be calculated at an amount equal to 12-month expected credit losses, or lifetime expected credit losses if there has been a significant increase in the credit risk on the instrument. The Group initially expects to avail itself of the simplified approach (allowance for lifetime expected credit losses of an asset) for its accounts receivable. It does not foresee a significant impact in this regard, in view of the fact that there is a procedure already in place, which not only writes down accounts receivable when they are no longer recoverable (incurred losses), but also takes into consideration possible expected losses, based on the evolution of customers’ collection periods (Ferrovial will adapt this procedure to meet the specific requirements of IFRS 9 and will extend it to companies where it is not currently applied), and in view of the credit risk of its customers (mostly public authorities) and the internal classification systems in place for contracting with those customers.
  3. Classification and measurement of financial assets. A new classification is introduced that reflects the business model within which financial assets are held. The main classification categories are: financial assets measured at amortised cost (assets held to maturity in order to collect contractual cash flows: principal and interest), financial assets at fair value through profit or loss (assets held for trading) and financial assets at fair value through other comprehensive income, in cases where both business models apply. The IAS 39 available-for-sale category of financial instruments is therefore eliminated. As regards the measurement of financial liabilities, IFRS 9 does not introduce any changes with respect to IAS 39, except that, in relation to the fair value option, any changes in fair value of a financial liability attributable to own credit risk must be recognised in other comprehensive income (provided this does not give rise to an accounting mismatch). Based on its preliminary analysis of this phase, the Group does not expect any significant impact, since most of its assets and liabilities will continue to be recognised at amortised cost.

Unlike IFRS 15, the hedge accounting requirements of IFRS 9, which is where the main impact is expected to arise, as described above, will be applied prospectively and, therefore, there will be no first-time application adjustment. The expected impact of adoption of IFRS 9 on the Group’s consolidated financial statements is not disclosed because it cannot be estimated reliably, since this impact will depend on both the financial instruments held by the Group and the economic conditions prevailing at the date of adoption.

IFRS 16. Leases:

The analysis of the impact of IFRS 16 is at an earlier stage than that of the aforementioned standards. IFRS 16 is mandatorily applicable in 2019 and the Group does not intend to apply the standard early.

The impact is no different to that at other companies, where the amounts in the statement of financial position will be increased due to the recognition of right-of-use assets and financial liabilities for future payment obligations relating to leases classified to date as operating leases. The detail of operating leases is included in Note 6.5.3 to the consolidated financial statements and the related expense amounts to approximately EUR 412 million (detail of commitments under operating leases in the consolidated financial statements as at 31 December 2016). In addition, the aforementioned note includes a detail, by maturity and business line, of the amount of the future minimum lease payments for non-cancellable operating leases.

1.3.2. Basis of consolidation

In 2016 and 2015 the reporting dates of the separate financial statements of all the companies included in the scope of consolidation were either the same as, or were temporarily brought into line with, that of the Parent.

As indicated above, the consolidated Group applied consolidation criteria in accordance with IFRSs as adopted by the European Union (EU-IFRSs).

In this connection, set forth below is a detail of only those consolidation criteria that were adopted by the consolidated Group in preparing these consolidated financial statements either as an option permitted by IFRSs or, as the case may be, due to the specific nature of the industry in which it operates:

The contracts that are undertaken through unincorporated temporary joint ventures (UTEs) or similar entities that meet the IFRS 11 requirements for being classified as “joint operations” are proportionately consolidated. It is considered that, in these cases of joint control, the venturers have direct control over the assets, liabilities, income and expenses, and joint and several liability for the obligations, of these entities. Operations of this nature contributed to the consolidated Group assets, profits and sales of EUR 829 million, EUR 55 million and EUR 1,380 million, respectively, in 2016 (2015: EUR 499 million, EUR 4 million and EUR 987 million, respectively). Some of these entities could be considered material to the Group, since they account for more than 0.5% of consolidated sales:

Project

Activity

% ownership

Sales (€ million)

407 East Extension

Design and construction of the 407 East toll road in Toronto

50%

95

Ferrovial Lagan JV

Design and construction of the Scottish M8, M73 and M74 motorways

80%

154

Bam Ferrovial Kier JV

Work for the Farringdon railway station in London

33%

59

Flo JV

Construction of the Northern Line Extension and Thames Tideway Tunnel (Central Section), in London

50%

135

UTE Warrell Creek to Nambucca

Construction of a stretch of the Pacific Highway, in NSW Australia

50%

75

UTE Toowoomba

Construction of a bypass around the city of Toowoomba

50%

57

TOTAL

 

 

575

The companies over which Ferrovial, S.A. exercises significant influence or joint control in cases which do not meet the requirements in IFRS 11 for being classified as “joint operations” are accounted for using the equity method. A detail of the companies accounted for using this method can be found in Note 3.5. and in Appendix II.

  • Intra-Group balances and transactions are eliminated on consolidation. However, the transactions recognised in the statement of profit or loss in relation to construction contracts performed by the Construction Division for infrastructure project concession operators are not eliminated on consolidation, since contracts of this kind are treated as construction contracts under which the Group performs work for the concession grantor or regulator in exchange for the right to operate the infrastructure under the terms pre-established by the grantor or regulator. The grantor or regulator thus controls the asset from inception and grants the above-mentioned right in exchange for the work performed, and, therefore, the conclusion may be reached that at Group level the work is performed for third parties. This is in line with IFRIC 12. The non-elimination of these transactions had an impact of EUR 35 million on the consolidated statement of profit or loss, after taxes and non-controlling interests (2015: EUR 93 million). The detail of the transactions not eliminated on the basis of the foregoing is shown in Note 6.8, Related party transactions.

Appendix II contains a list of subsidiaries and associates.

1.3.3. Accounting policies applied to each item in the consolidated statement of financial position and consolidated statement of profit or loss

In line with the disclosures in Note 1.3.2 above, set forth below is a detail of only those accounting policies that were adopted by the consolidated Group in preparing these consolidated financial statements either as an option permitted by IFRSs or, as the case may be, due to the specific nature of the industry in which it operates or the materiality of the policy concerned.

1.3.3.1. Property, plant and equipment, investment property and intangible assets

  • Subsequent to initial recognition, the items included under “Intangible Assets”, “Investment Property” and “Property, Plant and Equipment” are measured at cost less any accumulated depreciation or amortisation and any accumulated impairment losses.
  • The Group uses the straight-line method to calculate the depreciation and amortisation charge for the assets included under “Intangible Assets”, “Investment Property” and “Property, Plant and Equipment”, except in the case of certain machinery in the construction business, which is depreciated using the diminishing balance method.

The consolidated companies depreciate their various items of property, plant and equipment basically within the following ranges of years of useful life:

 

Years of useful life

Buildings and other structures

10-50

Machinery, fixtures and tools

2-25

Furniture

2-15

Transport equipment

3-20

Other items of property, plant and equipment

2-20

1.3.3.2. Investments in infrastructure projects

This line item includes the investments in infrastructure made by infrastructure concession operators within the scope of IFRIC 12 (mainly toll roads), the remuneration for which consists of the right to collect the related charges based on the level of usage of the public service.

The assets acquired by the concession operator to provide the concession services but which do not form part of the infrastructure (vehicles, furniture, computer hardware, etc.) are not included in this line item because they are not returned to the concession grantor. Assets of this nature are classified under “Property, Plant and Equipment” and are depreciated over their useful life, using a method that reflects the pattern of consumption of their future economic benefits.

IFRIC 12 intangible asset model

All initial investments relating to the infrastructure that is subsequently returned to the grantor, including compulsory purchase costs and borrowing costs capitalised during construction, are amortised on the basis of the expected pattern of consumption applicable in each case (normally forecast vehicle numbers in the case of toll roads) over the term of the concession.

The investments contractually agreed on at the start of the concession on a final and irrevocable basis to be made at a later date during the term of the concession, and provided they are not investments made to upgrade infrastructure, are considered to be initial investments. For investments of this nature, an asset and an initial provision are recognised for the present value of the future investment, applying a discount rate to calculate the present value that is equal to the cost of the borrowings associated with the project. The asset is amortised based on the pattern of consumption over the entire term of the concession and the provision is increased by the related interest cost during the period until the investment is made.

Where a payment is made to the grantor to obtain the right to operate the concession, this amount is also amortised based on the pattern of consumption over the concession term.

A provision is recognised systematically for replacement investments over the period in which the related obligations accrue, which must have been set up in full by the time the replacement becomes operational. The provision is recognised on the basis of the pattern of consumption over the period in which the obligation arises, on a time proportion basis.

Infrastructure upgrade investments are those that increase the infrastructure’s capacity to generate revenue or reduce its costs. In the case of investments that will be recovered over the concession term, since the upgrade investments increase the capacity of the infrastructure, they are treated as an extension of the right granted and, therefore, they are recognised in the consolidated statement of financial position when they come into service. They are amortised as from the date on which they come into service based on the difference in the pattern of consumption arising from the increase in capacity. However, if, on the basis of the terms and conditions of the concession, these investments will not be offset by the possibility of obtaining increased revenue from the date on which they are made, a provision is recognised for the best estimate of the present value of the cash outflow required to settle the obligations related to the investments that will not be offset by the possibility of obtaining increased revenue from the date on which the investments are made. The balancing item is a higher acquisition cost of the intangible asset.

In the case of the proportional part of the upgrade or increase in capacity that is expected to be recovered through the generation of increased future revenue, the general accounting treatment used for investments that will be recovered in the concession term will be applied.

The main assumptions used in relation to these arrangements correspond to vehicle number and replacement investment estimates, which are updated each year by technical departments.

Set forth below is a detail of the main toll road concessions in force to which the intangible asset model is applied, showing their duration, their status and the accounting method applied:

Toll road concessions accounted for using the intangible asset model:

Concession operator

Country

Concession term (years)

Status

First year of concession (*)

Accounting method

(*)

First year of the concession (if in operation) or year of commencement of construction (if at the construction phase).

(1)

The concession term is 43 years from the commencement of operation services, scheduled for 2018.

(2)

The concession term is 50 years from the completion of the construction work, estimated at 44 months from the reporting date.

(3)

The concession term is 50 years from the completion of the construction work, estimated at 60 months from the reporting date.

FC: Full consolidation; Eq. = Equity method.

NTE Mobility Partners, LLC

US

52

Operating

2014

FC

NTE Mobility Partners Seg 3 LLC (1)

US

43

Construction

2013

FC

LBJ Express

US

52

Operating

2014

FC

I-66 Mobility Partners LLC (3)

US

50

Construction

2016

Eq.

I-77 Mobility Partners LLC (2)

US

50

Construction

2014

FC

M-203 Alcalá O'Donnell

Spain

30

Construction

2005

FC

Autopista del Sol

Spain

55

Operating

1999

FC

Euroscut Azores

Portugal

30

Operating

2011

FC

Eurolink Motorway Operations (M4-M6)

Ireland

30

Operating

2005

Eq.

Nea Odos

Greece

30

Operating

2007

Eq.

Central Greece

Greece

30

Operating

2008

Eq.

Other concession arrangements accounted for using the intangible asset model:

In addition to the toll road concessions shown in the foregoing table, there are other arrangements to which the IFRIC 12 intangible asset model is applied, including most notably a concession of the Services Division held through Autovía de Aragón Sociedad Concesionaria, S.A. for the rehabilitation and subsequent maintenance of a stretch of the Nacional II road in Spain. The main contracts of the Services Division are as follows:

Concession operator

Country

Concession term (years)

First year of concession (*)

Accounting method

(*)

First year of the concession (if in operation) or year of commencement of construction (if at the construction phase).

(1)

Bifurcated models (intangible asset / financial asset).

FC: Full consolidation; Eq. = Equity method.

Autovía Aragón

Spain

19 years

2007

FC

Servicios Urbanos de Murcia

Spain

20 years

2011

FC

Planalto Beirao

Portugal

25 years

2006

FC

Ecoparc Can Mata (1)

Spain

14 years

2011

FC

Gesmat (1)

Spain

20 years

2012

FC

Amey Hallam Highways (1)

UK

25 years

2012

Eq.

Secado Térmico Butarque

Spain

25 years

2002

Prop.

Infrastructure project receivables – IFRIC 12

“Investments in Infrastructure Projects – Financial Asset Model” includes the service concession arrangements related to infrastructure in which the consideration consists of an unconditional contractual right to receive cash or another financial asset, either because the grantor guarantees to pay the operator specified or determinable amounts or because it guarantees to pay the operator the shortfall between amounts received from users of the public service and specified or determinable amounts. Therefore, these are concession arrangements in which demand risk is borne in full by the grantor. In these cases, the amount due from the grantor is accounted for as a loan or receivable in assets in the consolidated statement of financial position.

To calculate the amount due from the grantor, the value of the construction, operation and/or maintenance services provided and the interest implicit in arrangements of this nature are taken into consideration.

Revenue from the services (mainly construction and maintenance) provided in each period increases the amount of the related receivables with a credit to sales. The interest on the consideration for the services provided also increases the amount of the receivables with a credit to sales. Amounts received from the grantor reduce the total receivable with a charge to cash.

This interest is accounted for in accordance with IAS 18, Revenue. Under IAS 18, revenue is the gross inflow of economic benefits during the period arising in the course of the ordinary activities of an entity when those inflows result in increases in equity. In this regard, it can be considered that the interest income from concessions of this type should be classified as revenue, since it forms part of the ordinary concession activity and is earned on a regular and periodic basis.

At 31 December 2016, the interest recognised as revenue amounted to EUR 189 million (31 December 2015: EUR 194 million). Also, the borrowing costs associated with the financing of concessions to which the financial asset model is applied amounted to EUR 87 million in 2016 (2015: EUR 87 million) (see breakdown by contract).

Set forth below is a detail of the main toll road concessions in force to which the financial asset model is applied, showing their duration, their status and the accounting method applied:

Toll road concessions accounted for using the financial asset model

Concession operator

Country

Concession term (years)

Status

First year of concession (*)

Accounting method

(*)

First year of the concession (if in operation) or year of commencement of construction (if at the construction phase).

(1)

Projects reclassified to “Assets Classified as Held for Sale”

(2)

The concession term is 30 years from the completion of the construction work, scheduled for September 2017.

(3)

The concession term is 25 years from the completion of the construction work, scheduled for December 2018.

(4)

The concession term is 30 years from the completion of the construction work, scheduled for December 2019.

(5)

The concession term is 20 years from the completion of the construction work, scheduled for June 2021.

(6)

The concession term is 30 years from the completion of the construction work, scheduled for December 2020.

FC: Full consolidation; Eq. = Equity method.

Autopista Terrasa Manresa

Spain

50

Operating

1989

FC

Auto-Estradas Norte Litoral (1)

Portugal

30

Operating

2006

FC

Autoestrada do Algarve, S.A. (1)

Portugal

30

Operating

2004

FC

Eurolink M3

Ireland

45

Operating

2010

Eq.

A66 Benavente – Zamora

Spain

30

Operating

2015

Eq.

A-334 Autovía del Almanzora

Spain

30

Design

2012

Eq.

407 East Extension

Canada

30

Operating

2016

Eq.

Scot Roads Partnership Project Limited (2)

UK

30

Construction

2014

Eq.

Nexus Infr. Unit Trust (Toowoomba) (3)

Australia

25

Construction

2015

Eq.

Blackbird Infrastructure Group (4) (407 East Phase 2)

Canada

30

Construction

2015

Eq.

Ruta del Cacao, S.A.S. (5)

Colombia

20

Construction

2015

Eq.

Zero Bypass Ltd. (6)

Slovakia

30

Construction

2016

Eq.

Other concession arrangements accounted for using the financial asset model:

The other arrangements to which the financial asset model is applied relate to the Services and Construction Divisions.

Following is a detail of the most significant concession arrangements of the Construction Division:

Concession operator

Country

Concession term (years)

First year of concession (*)

Accounting method

(*)

First year of the concession (if in operation) or year of commencement of construction (if at the construction phase).

FC: Full consolidation; Eq. = Equity method.

Concesionaria de Prisiones Lledoners

Spain

32

2008

FC

Conc. Prisiones Figueras, S.A.U.

Spain

32

2011

FC

Depusa Aragón, S.A.

Spain

25

2015

FC

Aparcamiento Budimex

Poland

30 years and 4 months

2012

FC

Urbicsa Ciudad de la Justicia

Spain

35 years

2003

Eq.

Concesionaria Vía Olmedo Pedralba

Spain

25 years

2013

Eq.

As regards the Services Division, the most significant arrangements are as follows:

Concession operator

Country

Concession term (years)

Status (*)

First year of concession

Accounting method

(*)

1: Operating; 2: Construction; 3: Construction/Operating.

FC: Full consolidation; Eq. = Equity method; Prop. = Proportionate consolidation.

CTR Oris

Spain

16 years

1

2014

FC

Juan Grande

Spain

18 years

3

2014

Prop.

Salto del Negro

Spain

16 years

3

2014

Prop.

Smart Hospital Cantabria

Spain

20 years

1

2014

FC

Toll Road IM08 DDS

Poland

6 years

1

2014

FC

IM009 DDS

Poland

5 years

1

2016

FC

AmeyCespa WM East

UK

28 years

1

2008

FC

AmeyCespa MK SPV

UK

18 years

2

2013

FC

Amey (IOW) SPV Ltd

UK

25 years

3

2015

FC

Madrid Calle 30

Spain

35 years

1

2005

Eq.

Integrated Bradford SPV One Ltd

UK

27 years

1

2006

Eq.

Integrated Bradford SPV Two Ltd

UK

27 years

1

2009

Eq.

Amey Lagan Roads Ltd

UK

30 years

1

2007

Eq.

Amey Lighting Norfolk Limited

UK

25 years

1

2007

Eq.

E4D&G Project Co Ltd

UK

32 years

1

2008

Eq.

Amey Belfast Schools Partnership Pfi Co Ltd

UK

31 years

1

2008

Eq.

The Renfrewshire Schools Partnership Ltd

UK

33 years

1

2005

Eq.

Amey Birmingham Highways Ltd

UK

25 years

2

2010

Eq.

Amey Highways Lighting Manchester Limited

UK

25 years

1

2004

Eq.

Amey Highways Lighting Wakefield Limited

UK

25 years

1

2003

Eq.

Services Support A&S Ltd

UK

30 years

1

2004

Eq.

Scot Roads Partnership Project Ltd

UK

33 years

2

2014

Eq.

AmeyCespa (AWRP) SPV Ltd

UK

29 years

2

2014

Eq.

1.3.3.3. Other items in the consolidated statement of financial position and consolidated statement of profit or loss

Cash and cash equivalents of infrastructure projects: Restricted cash (Note 5.2)

“Cash and Cash Equivalents – Infrastructure Projects – Restricted Cash” includes short-term, highly liquid investments assigned to the financing of certain infrastructure projects, the availability of which is restricted under the financing contracts as security for certain obligations relating to the payment of debt principal and interest and to the maintenance and operation of the infrastructure.

Fair value measurement

The Group only uses fair value measurements in the case of derivative financial instruments. In such measurements, the credit risk of the parties to the related agreement is taken into account. The impact of credit risk is recognised in profit or loss, except when the derivatives qualify as effective hedges, in which case it is recognised in reserves. The Group uses appropriate measurement techniques based on the circumstances and on the volume of inputs available for each item, attempting to maximise the use of relevant observable inputs and avoiding the use of unobservable inputs. The Group establishes a fair value hierarchy that categorises the inputs to valuation techniques used to measure fair value into the following three levels:

  • Level 1: quoted prices for identical assets or liabilities.
  • Level 2: inputs other than quoted prices that are observable for the asset or liability, either directly or indirectly.
  • Level 3: unobservable inputs for the asset or liability.

As indicated in Note 5.5, Derivative financial instruments at fair value, all the Group’s derivative financial instruments fall into Level 2.

Non-refundable grants related to assets

Non-refundable grants related to assets are measured at the amount granted under "Deferred Income" (see Note 6.1) in the consolidated statement of financial position, and are taken to profit or loss gradually in proportion to the period depreciation on the assets financed with these grants and are recognised under "Depreciation and Amortisation Charge". From the cash flow standpoint, the amount of the grants collected in the year is presented as a reduction of the amount of the investments made.

Trade payables

"Trade Payables" includes the balances payable to suppliers under reverse factoring arrangements with banks.

These balances are classified as trade payables and the related payments as cash flows from operating activities, since the payments are made to the banks in the same periods as those agreed on with the suppliers in the operating cycle of the business, with no additional deferral or special guarantees to secure the payments to be made.

1.3.3.4 Revenue recognition

Set forth below are specific details of the methods applied to recognise revenue in each of the segments in which Ferrovial operates. See Note 1.3.1.b for a description of the changes and expected impacts of the new standard IFRS 15, Revenue from Contracts with Customers.

Construction business

i) General revenue recognition methods

Construction business revenue is recognised in accordance with IAS 11, whereby revenue and associated costs are recognised in the statement of profit or loss by reference to the stage of completion of the contract activity at the end of the reporting period, provided that the outcome of the construction contract can be estimated reliably (stage of completion). Any expected loss on the construction contract is recognised as an expense immediately.

The Group habitually conducts surveys of the work performed (output method, based on measurement of units produced), which is made possible in practice by the existence in all the contracts of a definition of all the units of work and the price at which each unit is to be certified and by budgeting tools for monitoring variances. At the end of each month, the units executed in each contract are measured and the output for the month is recognised as revenue. Contract costs are recognised on an accrual basis, and the costs actually incurred in completing the units of work are recognised as an expense, together with those which, even though they may be incurred in the future, have to be allocated to the project units completed. In certain jurisdictions in which the policy applied in accordance with generally accepted practice is to recognise revenue on the basis of the stage of completion measured in terms of the costs incurred (input method), the proportion that contract costs incurred bear to the estimated total contract costs is used to determine the revenue to be recognised, by reference to the margin for the entire term of the contract.

In exceptional cases, where it is not possible to estimate the margin for the entire contract, the total costs incurred are recognised and sales that are reasonably assured with respect to the completed work are recognised as contract revenue, subject to the limit of the total contract costs incurred.

The new standard IFRS 15, Revenue from Contracts with Customers, which is the same as the standard issued by the FASB, will make it possible for the Group to adopt a uniform revenue recognition method, irrespective of the various jurisdictions in which Ferrovial operates.

For construction contracts, a single performance obligation will be identified owing to the high degree of integration and customisation of the various goods and services to provide a combined output that is transferred to the customer over time. The Group will recognise revenue over time using, as its preferred option, the output method in those contracts for which there is a breakdown of the units produced and unitary prices or for which this information is available and is used by management for decision-taking purposes. Use of the cost to complete method (input method based on resources consumed) will only be permitted as a residual approach in fixed fee lump-sum contacts, in which the aforementioned requirements are not met.

ii) Recognition of revenue from contract modifications and claims

Contract modifications are work additional to those envisaged in the original contract that require approval by the customer. Contract modifications normally give rise to changes in both the work to be performed and the price.

Claims are amounts not covered by the principal contract, which are the subject of dispute with the customer and can arise from modifications that have not been agreed by the customer or other types of consideration requested of the customer, such as the reimbursement of unforeseen costs.

Modifications to the initial contract require the customer’s technical and financial approval prior to the issue of billings and collection of the amounts relating to additional work. The Group does not recognise revenue from such additional work until approval is reasonably assured and the revenue can be measured reliably. The costs associated with these additional units of output are recognised when incurred.

If the modifications become claims because they are subject to a dispute with the customer or are taken to arbitration or before the courts, no additional revenue is recognised and the revenue previously recognised only continues to be recognised if there is a legal report that supports the high probability of recovering the amount in dispute. This method is also followed in other types of claim process.

As mentioned in Note 1.3.1-b) on new standards, under IFRS 15 customer approval is required in order for revenue arising from contract modifications and claims to be recognised. In cases where the additional work has been approved but the corresponding change in price has not been determined, the requirement for variable consideration will be applied: namely, to recognise revenue for an amount with respect to which it is highly probable that a significant reversal will not occur.

iii) Statement of financial position balances relating to revenue recognition

Unlike the method used to recognise contract revenue, the amounts billed to the customer are based on achievement of the various milestones established in the contract and on acknowledgement thereof by the customer, which takes the form of a contractual document called "certificate of completion". Thus, the amounts recognised as revenue for a given year do not necessarily coincide with the amounts billed to or certified by the customer. In contracts for which the amount of revenue recognised exceeds the amount billed or certified, the difference is recognised in an asset account called “Amounts to be Billed for Work Performed” under “Trade Receivables for Sales and Services”, while in contracts for which the amount of revenue recognised is less than the amount billed or certified, the difference is recognised in a liability account called “Amounts Billed in Advance for Construction Work” under “Current Trade and Other Payables”.

iv) Other aspects

Initial contract costs incurred in the formalisation of the principal contract, costs of moving plant to the contract site, costs incurred in design, technical assistance and studies, building insurance costs, perimeter fencing costs and other initial contract costs are recognised as prepaid expenses. These costs are recognised as inventories provided that it is probable that they will be recovered in the future and they are recognised in profit or loss based on actual production with respect to estimated production under each contract. Otherwise, the costs are taken directly to the statement of profit or loss.

Late-payment interest arising from delays in the collection of billings is recognised when it is probable that the interest will be collected and its amount can be measured reliably, and is recognised as a financial result.

v) Judgements and estimates

Due to the very nature of contracts of this kind, and as can be inferred from the preceding paragraphs, the main factors affecting revenue and cost recognition are subject to significant judgements and estimates, such as the expected outcome of the contract, the amount of costs to be incurred at the end of the construction work, the measurement of the work completed in the period, the reasonableness of the accounting for a modification to the initial contract and the amount to be recovered from a claim. All these judgements and estimates are made by the persons in charge of performing the construction work, are subsequently reviewed at the various levels of the organisation, and are submitted to controls designed to ensure the consistency and reasonableness of the criteria applied.

Toll Road business

The arrangements included in this line of business are accounted for in accordance with IFRIC 12, which provides for the classification of the assets assigned to such arrangements on the basis of the intangible asset model and the financial asset model (bifurcated arrangements can also exist) (see Note 1.3.3.2).

The impact of the new standard IFRS 15, Revenue from Contracts with Customers will depend on the model applicable to each concession. In the case of concession arrangements accounted for using the intangible asset model, the customer is the user of the infrastructure and, therefore, each use made of the infrastructure by users is considered a performance obligation, and the related revenue is recognised at a point in time. In the case of concession arrangements accounted for using the financial asset model, in which the customer is the concession grantor, revenue recognition will depend on the various services provided (e.g. construction or maintenance), which will be accounted for as different performance obligations, to which market prices have to be allocated.

Services business

In general, the revenue from contracts involving various tasks and unit prices is recognised in the consolidated statement of profit or loss when the services are provided, in accordance with IAS 18, Revenue. In the case of certain long-term contracts with a single payment or annual payments revenue and costs are recognised by reference to the stage of completion, established both in the aforementioned IAS 18 and in IAS 11, Construction Contracts, on the basis of the costs incurred as a percentage of the total estimated costs (input method) as explained in the section on the Construction business. Revenue from contract modifications and claims is defined in the same way as in the case of the construction business, and is recognised based on a probability criterion as indicated in IAS 11. With respect to the first-time application of standard IFRS 15, the main impacts envisaged correspond to the three concepts mentioned in Note 1.3.1.

Lastly, it should be noted that the revenue from certain contracts that fall within the scope of IFRIC 12 is recognised as described in Note 1.3.3.2.

1.3.4. Accounting estimates and judgements

In the consolidated financial statements for 2016 estimates were made to measure certain of the assets, liabilities, income, expenses and obligations reported herein. These estimates relate basically to the following:

  • Estimates to define the methods for accounting for investees, including most notably in 2016 those relating to the SH-130 toll road, which led to the conclusion that it should be excluded from consolidation this year.
  • The estimates taken into consideration when recognising the results of contracts by reference to the stage of completion in the Construction and Services segments, in relation to the expected outcome of the contract, the estimate of possible budgeted losses, the amount of costs to be incurred at the end of the construction work, the measurement of the contract work performed in the period or the reasonableness of the accounting for a modification to the initial contract. All these judgements and estimates are made by the persons in charge of performing the construction work or services contracts, are subsequently reviewed at the various levels of the organisation, and are submitted to controls designed to ensure the consistency and reasonableness of the criteria applied (see Note 1.3.3.4 on revenue recognition in the Construction and Services businesses).
  • The assessment of possible legal contingencies (see Note 6.5, Contingent liabilities, contingent assets, obligations and commitments and Note 6.3, Provisions).
  • The assessment of possible impairment losses on certain assets (see Note 3.1, Goodwill and acquisitions, and Note 3.5, Investments in associates).
  • Estimates relating to the fair value of assets and liabilities acquired in the business combinations detailed in Note 1 on changes in the scope of consolidation.
  • Business performance projections that affect the estimates of the recoverability of tax assets (see Note 2.8 on tax matters).
  • Estimates regarding the valuation of derivatives and the expected flows associated with them in order to determine the existence of hedging relationships (see Note 5.5, Derivative financial instruments at fair value).
  • Estimates taking into account the future vehicle numbers on toll roads for the purpose of preparing financial information for toll roads pursuant to IFRIC 12 (see Note 3.3, Investments in infrastructure projects and Note 6.3, Provisions).
  • The assumptions used in the actuarial calculation of pension and other obligations to employees (see Note 6.2, Pension plan deficit).
  • The measurement of stock options and share award plans (see Note 6.7, Share-based payment).

Although these estimates were made using the best information available at 31 December 2016 on the events analysed, events that take place in the future might make it necessary to change these estimates. Changes in accounting estimates would be applied prospectively in accordance with the requirements of IAS 8.

1.3.5. Disclosures

It should also be noted that in preparing these consolidated financial statements the Group omitted any information or disclosures which, not requiring disclosure due to their qualitative importance, were considered not to be material in accordance with the concept of materiality defined in the IFRS Conceptual Framework.

to page top