1.3 ACCOUNTING POLICIES
1.3.1. New accounting standards
1.3.1.a) Early application of IFRS 15, Revenue from Contracts with Customers
Although the new standard is not mandatorily applicable until 1 January 2018, as stated in the consolidated financial statements for 2016, Ferrovial decided, making use of the option included in IFRS 15, to early apply the standard effective 1 January 2017. As a result of this decision, Ferrovial has changed its accounting policies and updated its internal processes and controls relating to revenue recognition.
IFRS 15 was applied retrospectively, recognising the cumulative effect of initially applying this standard as an adjustment to the opening balances for 2017 of the consolidated statement of financial position, calculated only for those contracts that were not completed contracts at 1 January 2017. Therefore, the comparative information for 2016 was not restated and continues to be presented in accordance with IAS 11 and IAS 18.
The impact, by line item, on the consolidated statement of financial position as at 1 January 2017 was as follows:
ASSETS |
BALANCE AT 01/01/17 |
TRANSITION TO IFRS 15 |
BALANCE AT 01/01/17 POST-IFRS 15 |
Non-current assets |
15,679 |
50 |
15,729 |
Investments in associates |
2,874 |
-8 |
2,867 |
Deferred tax assets |
1,057 |
58 |
1,115 |
Other non-current assets |
11,748 |
0 |
11,748 |
Current assets |
7,745 |
-279 |
7,465 |
Inventories |
516 |
25 |
541 |
Current trade and other receivables |
2,822 |
-304 |
2,518 |
Other current assets |
4,406 |
0 |
4,406 |
Total assets |
23,423 |
-229 |
23,194 |
EQUITY AND LIABILITIES |
BALANCE AT 01/01/17 |
TRANSITION TO IFRS 15 |
BALANCE AT 01/01/17 POST-IFRS 15 |
Equity |
6,314 |
-272 |
6,042 |
Equity attr. to the shareholders |
5,597 |
-272 |
5,325 |
Equity attr. to non-controlling interests |
717 |
0 |
717 |
Deferred income |
1,118 |
0 |
1,118 |
Non-current liabilities |
10,421 |
-2 |
10,419 |
Long-term provisions |
757 |
0 |
757 |
Deferred tax liabilities |
979 |
-2 |
977 |
Other non-current liabilities |
8,685 |
0 |
8,685 |
Current liabilities |
5,570 |
45 |
5,615 |
Current trade and other payables |
3,895 |
19 |
3,914 |
Operating provisions |
715 |
26 |
740 |
Other current liabilities |
960 |
0 |
960 |
Total equity and liabilities |
23,423 |
-229 |
23,194 |
The main impact of the application of this new standard was to reduce the equity attributable to shareholders by EUR -272 million, the main balancing entries being a reduction of EUR -304 million in the balance of trade and other receivables, basically amounts to be billed for work performed, and the tax effect of these adjustments, which was recognised for EUR 60 million in deferred taxes.
The main changes in accounting policies giving rise to these impacts relate mainly to the following three issues:
- Definition of distinct performance obligations in long-term services contracts and allocation of a price to each obligation. This relates mainly to long-term contracts (more than ten years) in the Services Division in which Ferrovial carries out various different activities throughout the life of the infrastructure (Capex, Opex and Lifecycle). Under the previous standards, these contracts were regarded as having a single performance obligation, the outcome of which was recognised by reference to the overall revenue from the contract. Under the new standard, unlike the above-mentioned criterion, several performance obligations are recognised (IFRS 15.27), to which the prices established in the contract, provided they are deemed to be market prices, are allocated (IFRS 15.73-80). The effect of this new criterion is to delay the recognition of revenue, insofar as the expected margin on the performance obligations already satisfied is generally lower than that forecast for the contract as a whole. The negative impact of this adjustment on equity attributable to the shareholders amounted to EUR 70 million.
- Change in the method of recognising revenue from contract modifications and transactions subject to variable consideration. In the case of revenue arising from contract modifications, IFRS 15 requires customer approval (IFRS 15.18), a stricter criterion than the probability requirement in the current standards (IAS 11.13 and IAS 18.18).
In the case of transactions subject to variable consideration, the new standard establishes that revenue from the transaction is recognised to the extent that it is highly probable that a significant reversal in the amount of cumulative revenue recognised will not occur when the uncertainty associated with the variable consideration is subsequently resolved (IFRS 15.56-58). The transactions subject to variable consideration include most notably revenue from claims submitted to customers and contractual incentive payments, which were recognised using a probability criterion under the previous standard (IAS 11.14 and 15). This change gives rise to a delay in the recognition of revenue as the new standard establishes stricter criteria.
The negative impact on equity attributable to the shareholders in this connection amounted to EUR 168 million. - Establishment of a consistent revenue recognition method for contracts with similar characteristics. The new standard requires a consistent revenue recognition method to be used for contracts and performance obligations with similar characteristics (IFRS 15.40). The Group has chosen the output method for measuring the value of assets or services for which control is transferred to the customer over time, provided that the progress of the work performed can be measured on the basis of the contract and during its performance (IFRS 15.B17). In contracts to provide different highly interrelated goods or services in order to produce a combined output, which is habitually the case in contracts with a construction component, the applicable output method is that of surveys of performance completed to date, according to which the revenue recognised corresponds to the units of work performed, based on the price allocated thereto. Also, in routine service contracts in which the goods or services are substantially the same and are transferred with the same pattern of consumption, in such a way that the customer receives and consumes the benefits of the goods or services as the entity provides them, the method selected by the Group to recognise revenue is the “time elapsed” output method, whereas costs are recognised on an accrual basis. On the basis of the foregoing, the input method (based on resources consumed) will only be used when the progress of the work cannot be measured reliably by an output method. Application of this rule gives rise to a change of recognition method for certain contracts, and the negative impact on equity attributable to the shareholders is EUR 34 million.
1.3.1.b) New standards, amendments and interpretations adopted by the European Union mandatorily applicable for the first time in 2017
On 1 January 2017, the following standards which might have an impact on the consolidated financial statements came into force in the European Union: Amendments to IAS 7, Disclosure Initiative, Annual Improvements to IFRSs, 2014-2016 Cycle and Amendments to IAS 12, Recognition of Deferred Tax Assets for Unrealised Losses. With regard to IAS 7, a new disclosure has been added to Note 5.2, Consolidated net debt, including a reconciliation of net debt to the financing cash flows shown in the consolidated statement of cash flows; this reconciliation is only provided for the current year, since the amendment does not require disclosure of comparative information for the period preceding the date of adoption. No significant impact on the Group’s consolidated financial statements has been identified as a result of the amendments to IAS 12.
1.3.1.c) New standards, amendments and interpretations mandatorily applicable in annual reporting periods subsequent to 2017:
The new standards, amendments and interpretations approved by the IASB but not mandatorily applicable at 31 December 2017 that might have an effect on the Group are as follows:
IFRS 9, Financial Instruments:
The impacts identified are less important than those of IFRS 15, since the entities most affected by IFRS 9 are financial institutions. The mandatory application date is 1 January 2018.
Set forth below is a summary of the main impacts, following an analysis of the three phases of the standard:
- Hedge accounting. The standard attempts to align hedge accounting more closely with risk management, and the new requirements establish a principle-based approach. IFRS 9 generally permits the designation of specific components of non-financial items and of financial instruments as hedged items, provided that they are separately identifiable and reliably measurable and that there is a liquid market for the items concerned (IFRS 9 B.6.3.8 et seq), and, in certain cases, it specifically permits the hedging of the inflation component of certain financial instruments (IFRS 9 B6.3.13 to 6.3.15). In this connection, the Group has identified as a possible impact that relating to the index-linked derivatives arranged at HAH, which, as indicated above, could meet the requirements for hedge accounting from 2018 onwards. The analysis of this impact has not yet been completed. The hedge accounting requirements of IFRS 9 must be applied prospectively and, therefore, there will be no adjustment on initial application and the impact of adopting this standard will be disclosed in the Group’s consolidated financial statements for 2018. This impact will depend both on the financial instruments held in 2018, on the changes in the economic conditions affecting the valuation of those instruments, and on the specific results relating to the effectiveness of the future hedging relationships and, therefore, at the date of preparation of these consolidated financial statements, it cannot be estimated reliably.
- Impairment of financial assets. IFRS 9 replaces the incurred loss model of IAS 39 with a model based on expected credit losses. Under the new standard, the loss allowance for a financial instrument will be calculated at an amount equal to 12-month expected credit losses, or lifetime expected credit losses if there has been a significant increase in the credit risk on the instrument. The Group intends to avail itself of the simplified approach (measuring the loss allowance at an amount equal to lifetime expected credit losses) for its accounts receivable relating to contracts with customers. To this end, in order to implement this approach the Group has established a procedure which not only provides for the write-down of accounts receivable when they are no longer recoverable (incurred losses), but also takes into consideration possible expected losses, based on the evolution of the specific credit risk of the customer, its industry and its country. The estimated negative impact on equity attributable to the shareholders as a result of the impairment of financial assets amounts to EUR 10 million.
- Classification and measurement of financial assets. A new classification is introduced that reflects the business model within which financial assets are held by the company. No significant impacts are expected to arise as a result of this new classification. The only potential impact for the Group relates to equity instruments, which by defect must be measured at fair value through profit or loss, since at initial recognition it may elect to present subsequent changes in the fair value of these instruments in other comprehensive income. This election is irrevocable and is made for each asset on an individual basis. Assets of this kind amounted to EUR 34 million at 31 December 2017. With regard to financial liabilities, IFRS 9 does not introduce any changes with respect to IAS 39, except for the change in the treatment of renegotiations of financial liabilities that did not result in the derecognition of those liabilities. Nevertheless, no significant impact is expected, since most of the Group’s financial assets and liabilities will continue to be measured at amortised cost.
IFRS 16, Leases:
The analysis of the impact of IFRS 16 is at an earlier stage than that of the aforementioned standards. IFRS 16 is mandatorily applicable in 2019 and the Group does not intend to apply the standard early.
The impact is no different to that at other companies, where the amounts in the statement of financial position will be increased due to the recognition of right-of-use assets and financial liabilities for future payment obligations relating to leases classified to date as operating leases. The Group expects to adopt the recognition exemptions permitted for short-term leases (less than twelve months) and leases for which the underlying asset is of low value. The detail of operating leases is included in Note 6.5.3 to the consolidated financial statements and the related expense amounts to approximately EUR 523 million (detail of commitments under operating leases in the consolidated financial statements as at 31 December 2017). In addition, the aforementioned note includes a detail, by maturity and business line, of the amount of the future minimum lease payments for non-cancellable operating leases. From its preliminary analysis of the operating leases at the end of the reporting period, the Group identified EUR 350 million relating to the non-cancellable future minimum lease payments, discounted at the interest rate implicit in each lease considering the type of underlying asset and the country concerned, which could be comparable to the right-of-use asset and the financial liability that would have to be recognised in the statement of financial position. This estimate was made by reference to the lease portfolio and market conditions existing at 31 December 2018, although it could change as a result of variations in the two variables until the standard is effectively applied at 1 January 2019.
The new standards, amendments and interpretations approved by the IASB but not yet approved for use in the European Union at 31 December 2017 that might have an effect on the Group are as follows:
NEW STANDARDS, AMENDMENTS AND INTERPRETATIONS |
OBLIGATORY APPLICATION IN ANNUAL REPORTING PERIODS BEGINNING ON OR AFTER: |
|
IFRIC Interpretation 22 |
Foreign Currency Transactions and Advance Consideration |
1 January 2018 |
IFRIC Interpretation 23 |
Uncertainty Over Income Tax Treatments |
1 January 2019 |
Amendments to IFRS 2 |
Classification and Measurement of Share-based Payment Transactions |
1 January 2018 |
Amendments to IAS 40 |
Investment Property |
1 January 2018 |
Amendments to IFRS 9 |
Prepayment Features with Negative Compensation |
1 January 2019 |
Amendments to IAS 28 |
Long-term Interests in Associates and Joint Ventures |
1 January 2019 |
Annual improvements |
2015-2017 cycle |
1 January 2019 |
Amendments to IAS 19 |
Plan Amendments, Curtailments and Settlements |
1 January 2019 |
None of these standards is expected to have a significant impact for Ferrovial.
1.3.2. Basis of consolidation
In 2017 and 2016 the reporting dates of the separate financial statements of all the companies included in the scope of consolidation were either the same as, or were temporarily brought into line with, that of the Parent.
As indicated above, the consolidated Group applied consolidation criteria in accordance with IFRSs as adopted by the European Union (EU-IFRSs). In this regard, in order to determine whether it has control, joint control or significant influence over each Group company, the Group reviews whether the shareholding owned is consistent with the voting control held over the company by virtue of the relevant bylaws and shareholder agreements.
Companies over which it is determined that the Group exercises joint control are generally accounted for using the equity method.
In relation to these jointly controlled businesses, apart from the situations in which there are two venturers, each with a 50% ownership interest, the cases requiring a more in-depth analysis are those relating to infrastructure projects in which Ferrovial is the shareholder with the largest ownership interest (less than or equal to 50%) and has the right to propose the Chief Executive Officer or other executives of the investee, while the other shareholders, mainly infrastructure funds, have a direct participation in the Board of Directors. In all these cases, it was concluded that the projects must be accounted for using the equity method because Ferrovial does not have the right to appoint the majority of the Board of Directors of the companies concerned, the Board decisions require a simple or qualified majority in all cases, including for the appointment of the main executives, and, in the event of a stalemate on a given decision, Ferrovial does not have the capacity to break the deadlock on its own. The most noteworthy examples of such cases are the investments in the concession operators of the following toll road projects (showing the respective percentages of ownership in brackets): I-66 (50%), 407 ETR (43.2%), Slovakia (35%), Toowoomba (40%) and OSARS (50%).
Contracts undertaken through unincorporated temporary joint ventures (UTEs) or similar entities that meet the IFRS 11 requirements to be classified as “joint operations” are proportionately consolidated. In these cases of joint control, the venturers are considered to have direct control over the assets, liabilities, income and expenses, and to have joint and several liability for the obligations, of the venture. Operations of this nature contributed to the consolidated Group assets, profit or loss and sales of EUR 913 million, EUR -19 million and EUR 1,406 million, respectively (EUR 829 million, EUR 55 million and EUR 1,380 million in 2016). Particularly worthy of note due to their materiality (sales representing more than 0.5% of consolidated sales) are the following companies relating to construction projects:
CONSTRUCTION PROJECT |
|
% OWNERSHIP |
SALES (€ million) |
Northern Line / Thames Tideway Tunnel |
Design and construction of the Thames Tideway tunnel and Northern Line extension of the London Underground |
50% |
192 |
UTE Toowoomba |
Construction of a ring road in the city of Toowomba, Australia |
50% |
136 |
407 East Extension |
Construction of the 407 East highway in Toronto |
50% |
76 |
Northern Beaches |
Design and construction of improvements to the road network around the hospital of Northern Beaches in Australia |
70% |
67 |
Total |
|
|
471 |
The companies over which Ferrovial, S.A. exercises significant influence or joint control and which do not meet the requirements in IFRS 11 to be classified as “joint operations” are accounted for using the equity method. A detail of the companies accounted for using this method can be found in Note 3.5. and in Appendix II.
With regard to the companies over which it is considered that the Group has significant influence, it should be noted that certain companies in which an ownership interest of less than 20% is held (directly or indirectly) are accounted for using the equity method, provided that Ferrovial can appoint a member of their Boards of Directors.
Intra-Group balances and transactions are eliminated on consolidation. However, the transactions recognised in the statement of profit or loss in relation to construction contracts performed by the Construction Division for infrastructure project concession operators are not eliminated on consolidation, since contracts of this kind are treated as construction contracts under which the Group performs work for the concession grantor or regulator in exchange for the right to operate the infrastructure under the terms pre-established by the grantor or regulator. The grantor or regulator thus controls the asset from inception and grants the above-mentioned right in exchange for the work performed, and, therefore, the conclusion may be reached that at Group level the work has been performed for third parties. This is in line with IFRIC 12. The non-elimination of these transactions had an impact of EUR 18 million on the consolidated statement of profit or loss, after taxes and non-controlling interests (2016: EUR 35 million). The detail of the transactions not eliminated on the basis of the foregoing is shown in Note 6.8, Related party transactions.
Appendix II contains a list of subsidiaries and associates.
Lastly, in acquisitions or disposals of ownership interests that do not result in a change in control, the non-controlling (minority) interest may be measured either at fair value or at the non-controlling interest’s proportionate share of the acquiree’s identifiable net assets.
The general method applied by the Group shall be that which avoids the early recognition of gains in the Company’s equity. Thus, the non-controlling interest is recognised at its fair value in the case of the sale of ownership interests for more than their carrying amount or the purchase of ownership interests for less than their carrying amount. Similarly, the related losses are recognised in the Company’s equity in the case of the sale of ownership interests for less than their carrying amount or the purchase of ownership interests for more than their carrying amount.
1.3.3. Accounting policies applied to items in the consolidated statement of financial position and consolidated statement of profit or loss
Set forth below is a detail of only those accounting policies that were adopted by the consolidated Group in preparing these consolidated financial statements either as an option permitted by IFRSs or, as the case may be, due to the specific nature of the industry in which it operates or the materiality of the policy concerned.
1.3.3.1. Property, plant and equipment, investment property and intangible assets
- Subsequent to initial recognition, the items included under “Intangible Assets”, “Investment Property” and “Property, Plant and Equipment” are measured at cost less any accumulated depreciation or amortisation and any accumulated impairment losses.
- The Group uses the straight-line method to calculate the depreciation and amortisation charge for the assets included under “Intangible Assets”, “Investment Property” and “Property, Plant and Equipment”, except in the case of certain machinery in the construction business, which is depreciated using the diminishing balance method.
The consolidated companies depreciate their various items of property, plant and equipment basically within the following ranges of years of useful life:
|
YEARS OF USEFUL LIFE |
Buildings and other structures |
10-50 |
Machinery, fixtures and tools |
2-25 |
Furniture |
2-15 |
Transport equipment |
3-20 |
Other items of property, plant and equipment |
2-20 |
1.3.3.2. Investments in infrastructure projects
This line item includes the investments made in infrastructure by infrastructure concession operators within the scope of IFRIC 12 (mainly toll roads), the remuneration for which consists of an unconditional right to receive cash or another asset or the right to collect the related charges based on the level of usage of the public service.
The assets acquired by the concession operator to provide the concession services but which do not form part of the infrastructure (vehicles, furniture, computer hardware, etc.) are not included in this line item because they are not returned to the concession grantor. Assets of this nature are classified under “Property, Plant and Equipment” and are depreciated over their useful life, using a method that reflects the pattern of consumption of their future economic benefits.
IFRIC 12 intangible asset model
All initial investments relating to the infrastructure that is subsequently returned to the grantor, including compulsory purchase costs and borrowing costs capitalised during construction, are amortised on the basis of the expected pattern of consumption applicable in each case (normally forecast vehicle numbers in the case of toll roads) over the term of the concession.
The investments contractually agreed on at the start of the concession on a final and irrevocable basis to be made at a later date during the term of the concession, and provided they are not investments made to upgrade infrastructure, are considered to be initial investments. For investments of this nature, an asset and an initial provision are recognised for the present value of the future investment, applying a discount rate to calculate the present value that is equal to the cost of the borrowings associated with the project. The asset is amortised based on the pattern of consumption over the entire term of the concession and the provision is increased by the related interest cost during the period until the investment is made.
Where a payment is made to the grantor to obtain the right to operate the concession, this amount is also amortised based on the pattern of consumption over the concession term.
A provision is recognised systematically for replacement investments over the period in which the related obligations accrue, and it must be set up in full by the time the replacement becomes operational. The provision is recognised on the basis of the pattern of consumption over the period in which the obligation arises, on a time proportion basis.
Infrastructure upgrade investments are those that increase the infrastructure’s capacity to generate revenue or reduce its costs. In the case of investments that will be recovered over the concession term, since the upgrade investments increase the capacity of the infrastructure, they are treated as an extension of the right granted and, therefore, they are recognised in the consolidated statement of financial position when they come into service. They are amortised as from the date on which they come into service based on the difference in the pattern of consumption arising from the increase in capacity. However, if, on the basis of the terms and conditions of the concession, these investments will not be offset by the possibility of obtaining increased revenue from the date on which they are made, a provision is recognised for the best estimate of the present value of the cash outflow required to settle the obligations related to the investments that will not be offset by the possibility of obtaining increased revenue from the date on which the investments are made. The balancing item is an addition to the acquisition cost of the intangible asset.
In the case of the proportional part of the upgrade or increase in capacity that is expected to be recovered through the generation of increased future revenue, the general accounting treatment used for investments that will be recovered in the concession term will be applied.
The main assumptions used in relation to these arrangements correspond to vehicle number and replacement investment estimates, which are updated each year by technical departments.
Set forth below is a detail of the main toll road concessions in force to which the intangible asset model is applied, showing their duration, their status and the accounting method applied:
Toll road concessions accounted for using the intangible asset model:
CONCESSION OPERATOR |
COUNTRY |
CONCESSION TERM (YEARS) |
STATUS |
FIRST YEAR OF |
ACCOUNTING METHOD |
||
|
|||||||
NTE Mobility Partners, LLC |
US |
52 |
Operating |
2014 |
FC |
||
NTE Mobility Partners Seg 3 LLC |
US |
43 |
Construction |
2013 |
FC |
||
LBJ Express |
US |
52 |
Operating |
2014 |
FC |
||
I-66 Mobility Partners LLC |
US |
50 |
Construction |
2016 |
Eq. |
||
I-77 Mobility Partners LLC |
US |
50 |
Construction |
2014 |
FC |
||
Autopista del Sol |
Spain |
55 |
Operating |
1999 |
FC |
||
Euroscut Azores |
Portugal |
30 |
Operating |
2011 |
FC |
||
Eurolink Motorway Operations (M4-M6) |
Ireland |
30 |
Operating |
2005 |
Eq. |
||
Nea Odos |
Greece |
30 |
Operating |
2007 |
Eq. |
||
Central Greece |
Greece |
30 |
Operating |
2008 |
Eq. |
Other concession arrangements accounted for using the intangible asset model:
In addition to the toll road concessions shown in the foregoing table, there are other arrangements to which the IFRIC 12 intangible asset model is applied, including most notably a concession of the Services Division held through Autovía de Aragón Sociedad Concesionaria, S.A. for the rehabilitation and subsequent maintenance of a stretch of the Nacional II road in Spain. The main contracts of the Services Division are as follows:
CONCESSION OPERATOR |
COUNTRY |
CONCESSION TERM (YEARS) |
FIRST YEAR OF CONCESSION (*) |
ACCOUNTING METHOD |
||||
|
||||||||
Autovía Aragón |
Spain |
19 years |
2007 |
FC |
||||
Servicios Urbanos de Murcia |
Spain |
20 years |
2011 |
FC |
||||
Plan Alto Beirao |
Portugal |
25 years |
2006 |
FC |
||||
Ecoparc Can Mata (1) |
Spain |
14 years |
2011 |
FC |
||||
Gesmat |
Spain |
20 years |
2012 |
FC |
IFRIC 12 financial asset model (Note 12)
“Investments in Infrastructure Projects – Financial Asset Model” includes the service concession arrangements related to infrastructure in which the consideration consists of an unconditional contractual right to receive cash or another financial asset, either because the grantor guarantees to pay the operator specified or determinable amounts or because it guarantees to pay the operator the shortfall between amounts received from users of the public service and specified or determinable amounts. Therefore, these are concession arrangements in which demand risk is borne in full by the grantor. In these cases, the amount due from the grantor is accounted for as a loan or receivable in assets in the consolidated statement of financial position.
To calculate the amount due from the grantor, the value of the construction, operation and/or maintenance services provided and the interest implicit in arrangements of this nature are taken into consideration.
Revenue from the services (mainly construction and maintenance) provided in each period increases the amount of the related receivables with a credit to sales. The interest on the consideration for the services provided also increases the amount of the receivables with a credit to sales. Amounts received from the grantor reduce the total receivable with a charge to cash.
The aforementioned interest in concession arrangements of this type is classified as revenue, since it forms part of the ordinary concession activity and is earned on a regular and periodic basis.
At 31 December 2017, the interest recognised as revenue amounted to EUR 153 million (31 December 2016: EUR 189 million). Also, the borrowing costs associated with the financing of concessions to which the financial asset model is applied amounted to EUR 52 million in 2017 (2016: EUR 72 million). The decrease in the two items is due mainly to the Portuguese toll roads Norte Litoral and Algarve, which are now accounted for using the equity method (see Note 1.1.3).
Set forth below is a detail of the main toll road concessions in force to which the financial asset model is applied, showing their duration, their status and the accounting method applied:
Toll road concessions accounted for using the financial asset model
CONCESSION OPERATOR |
COUNTRY |
YEARS |
STATUS |
FIRST YEAR OF CONCESSION (*) |
ACCOUNTING METHOD |
||||
|
|||||||||
Autopista Terrasa Manresa |
Spain |
50 |
Operating |
1989 |
FC |
||||
Auto-Estradas |
Portugal |
30 |
Operating |
2006 |
Eq. |
||||
Autoestrada do |
Portugal |
30 |
Operating |
2004 |
Eq. |
||||
Eurolink M3 |
Ireland |
45 |
Operating |
2010 |
Eq. |
||||
A66 Benavente - Zamora |
Spain |
30 |
Operating |
2015 |
Eq. |
||||
A-334 Autovía del Almanzora |
Spain |
30 |
Design |
2012 |
Eq. |
||||
407 East Extension |
Canada |
30 |
Operating |
2016 |
Eq. |
||||
Scot Roads Partnership Project Limited (**) |
UK |
30 |
Operating |
2017 |
Eq. |
||||
Nexus Infr. Unit Trust (Toowoomba) |
Australia |
25 |
Construction |
2015 |
Eq. |
||||
Blackbird Infrastructure Group (407 East |
Canada |
30 |
Construction |
2015 |
Eq. |
||||
Ruta del Cacao, S.A.S. |
Colombia |
20 |
Construction |
2015 |
Eq. |
||||
Zero Bypass Ltd. |
Slovakia |
30 |
Construction |
2016 |
Eq. |
||||
Netflow OSARs Western |
Australia |
20 |
Construction |
2017 |
Eq. |
Other concession arrangements accounted for using the financial asset model:
The other arrangements to which the financial asset model is applied relate to the Services, Construction and Airports Divisions.
Following is a detail of the most significant concession arrangements of the Construction Division:
CONCESSION OPERATOR |
COUNTRY |
CONCESSION TERM (YEARS) |
FIRST YEAR OF CONCESSION (*) |
ACCOUNTING METHOD |
||
|
||||||
Concesionaria de Prisiones Lledoners |
Spain |
32 |
2008 |
FC |
||
Conc. Prisiones Figueras, S.A.U. |
Spain |
32 |
2011 |
FC |
||
Depusa Aragón, S.A. |
Spain |
25 |
2015 |
FC |
||
Aparcamiento Wroclaw Budimex |
Poland |
30 years and 4 months |
2012 |
FC |
||
Urbicsa Ciudad de la Justicia |
Spain |
35 years |
2008 |
Eq. |
||
Concesionaria Vía Olmedo Pedralba |
Spain |
25 years |
2013 |
Eq. |
As regards the Services Division, the most significant arrangements are as follows:
CONCESSION OPERATOR |
COUNTRY |
CONCESSION TERM (YEARS) |
STATUS (*) |
FIRST YEAR OF CONCESSION (**) |
ACCOUNTING METHOD |
||||||
|
|||||||||||
CTR Oris |
Spain |
16 years |
1 |
2014 |
FC |
||||||
Juan Grande |
Spain |
18 years |
3 |
2014 |
Prop. |
||||||
Salto del Negro |
Spain |
16 years |
3 |
2014 |
Prop. |
||||||
Smart Hospital Cantabria |
Spain |
20 years |
1 |
2014 |
FC |
||||||
Toll Road IM08 DDS |
Poland |
6 years |
1 |
2014 |
FC |
||||||
IM009 DDS |
Poland |
5 years |
1 |
2016 |
FC |
||||||
AmeyCespa WM East |
UK |
28 years |
1 |
2008 |
FC |
||||||
AmeyCespa MK SPV |
UK |
18 years |
2 |
2013 |
FC |
||||||
Amey (IoW) SPV Ltd |
UK |
25 years |
3 |
2015 |
FC |
||||||
Madrid Calle 30 |
Spain |
35 years |
1 |
2005 |
Eq. |
||||||
Integrated Bradford SPV One Ltd |
UK |
27 years |
1 |
2006 |
Eq. |
||||||
Integrated Bradford SPV Two Ltd |
UK |
27 years |
1 |
2009 |
Eq. |
||||||
Amey Lagan Roads Ltd |
UK |
30 years |
1 |
2007 |
Eq. |
||||||
Amey Lighting Norfolk Limited |
UK |
25 years |
1 |
2007 |
Eq. |
||||||
E4D&G Project Co Ltd |
UK |
32 years |
1 |
2008 |
Eq. |
||||||
Amey Belfast Schools Partnership Pfi Co Ltd |
UK |
31 years |
1 |
2008 |
Eq. |
||||||
The Renfrewshire Schools Partnership Ltd |
UK |
33 years |
1 |
2005 |
Eq. |
||||||
Amey Birmingham Highways Ltd |
UK |
25 years |
2 |
2010 |
Eq. |
||||||
Amey Highways Lighting Manchester Limited |
UK |
25 years |
1 |
2004 |
Eq. |
||||||
Amey Highways Lighting Wakefield Limited |
UK |
25 years |
1 |
2003 |
Eq. |
||||||
Services Support A&S Ltd |
UK |
30 years |
1 |
2004 |
Eq. |
||||||
Scot Roads Partnership Project Ltd (***) |
UK |
30 years |
1 |
2017 |
Eq. |
||||||
Amey Hallam Highways |
UK |
25 years |
2 |
2012 |
Eq. |
The Airports Division has the following concession arrangement:
CONCESSION OPERATOR |
COUNTRY |
CONCESSION TERM (YEARS) |
STATUS |
FIRST YEAR OF CONCESSION (*) |
ACCOUNTING METHOD |
||
|
|||||||
Denver Great Hall |
US |
30 |
Construction |
2017 |
FC |
1.3.3.3. Other items in the consolidated statement of financial position and consolidated statement of profit or loss
Cash and cash equivalents of infrastructure project companies: Restricted cash (Note 5.2)
“Cash and Cash Equivalents – Infrastructure Projects – Restricted Cash” includes short-term, highly liquid investments assigned to the financing of certain infrastructure projects, the availability of which is restricted under the financing contracts as security for certain obligations relating to the payment of debt principal and interest and to the maintenance and operation of the infrastructure.
Fair value measurement
The Group only uses fair value measurements in the case of derivative financial instruments. In such measurements, the credit risk of the parties to the related agreement is taken into account. The impact of credit risk is recognised in profit or loss, except when the derivatives qualify as effective hedges, in which case it is recognised in reserves. The Group uses appropriate measurement techniques based on the circumstances and on the volume of inputs available for each item, attempting to maximise the use of relevant observable inputs and avoiding the use of unobservable inputs. The Group establishes a fair value hierarchy that categorises the inputs to valuation techniques used to measure fair value into the following three levels:
- Level 1: quoted prices for identical assets or liabilities.
- Level 2: inputs other than quoted prices that are observable for the asset or liability, either directly or indirectly.
- Level 3: unobservable inputs for the asset or liability.
As indicated in Note 5.5, Derivative financial instruments at fair value, all the Group’s derivative financial instruments fall into Level 2.
Other equity instruments
These relate to perpetual bonds for which payment of the related coupon is at the discretion of the issuer and which do not satisfy the condition to be accounted for as financial liabilities, since they do not include a contractual obligation to deliver cash or another financial asset or an obligation to exchange financial assets or financial liabilities. Accordingly, they are recognised under “Other Equity Instruments” in the Company’s equity.
Non-refundable grants related to assets
Non-refundable grants related to assets are recognised at the amount granted under "Deferred Income" (see Note 6.1) in the consolidated statement of financial position, and are taken to profit or loss gradually in proportion to the period depreciation on the assets financed with these grants and are allocated to the same line as those assets under “Depreciation and Amortisation Charge”. From the cash flow standpoint, the amount of the grants collected in the year is presented as a reduction of the amount of the investments made.
Trade payables
“Trade Payables” includes the balances payable to suppliers under reverse factoring arrangements with banks.
These balances are classified as trade payables and the payments relating thereto as cash flows from operating activities, since payment is made to the banks under the same terms and conditions as those agreed upon with the supplier, and the company that has the obligation to pay the latter does not obtain from the banks any extension to the due dates agreed with the supplier; the cost of the reverse factoring arrangement is borne by the supplier and no special guarantees have been provided as security for the payments to be made.
1.3.3.4 Revenue recognition
As indicated in Note 1.3.1 on the first-time application of IFRS 15, the Company changed its revenue recognition policies to adapt them to the provisions of this standard, which was applied early effective 1 January 2017. In order to ensure a uniform application across the various business areas, Ferrovial has developed a common policy. Set forth below are specific details of the methods applied as part of this policy, which affect mainly the Construction and Services businesses. Certain specific aspects affecting revenue recognition in each of the Group’s business segments are summarised in the last section.
I) General revenue recognition criterion
The first step for revenue recognition purposes is to identify the contracts and the performance obligations contained therein. The number of performance obligations that a contract has will depend on the type of contract and the activity, as indicated in reference to each of the Group’s business segments.
In general, the performance obligations in the Construction and Services businesses that Ferrovial engages in are satisfied over time and not at a specific point in time, since the customer simultaneously receives and consumes the benefits provided by the entity’s performance as the service is performed.
With respect to the method for recognising revenue over time (i.e. the method for measuring progress towards complete satisfaction of a performance obligation), Ferrovial has established certain criteria that are applied consistently for similar performance obligations.
In this regard, the method chosen by the Group to measure the value of goods or services for which control is transferred to the customer over time is the output method; this method is applied provided that the progress of the work performed can be measured on the basis of the contract and during its performance.
In contracts to provide different highly interrelated goods or services in order to produce a combined output, which is habitually the case in contracts with a construction activity, the applicable output method is that of surveys of performance completed to date (or measured unit of work), according to which revenue is recognised corresponding to the units of work performed and on the basis of the price allocated thereto. Under this method, on a regular basis, the units of work completed under each contract are measured and the corresponding output is recognised as revenue. Costs of work or services projects performed are recognised on an accrual basis, and the costs actually incurred in completing the units performed are recognised as an expense, together with those which, even though they are expected to be incurred in the future, have to be allocated to the units of work completed to date.
Also, in routine or recurring service contracts (in which the services are substantially the same), such as maintenance and cleaning services, which are transferred with the same pattern of consumption over time and whose remuneration consists of a recurring fixed amount over the term of the contract (e.g. monthly or annual payment), in such a way that the customer receives and consumes the benefits of the services as the entity provides them, the method selected by the Group to recognise revenue is the time elapsed output method. Under this method, revenue is recognised on a straight-line basis over the term of the contract and costs are recognised on an accrual basis.
Lastly, only in those contracts that are not for routine or recurring services and for which the unitary price of the units to be performed cannot be determined, use of the of the stage of completion measured in terms of the costs incurred (input method) is permitted. Under this method, the entity recognises revenue based on the proportion that costs incurred to date bear to the total costs expected to be incurred to complete the work, taking into account the expected margins of the whole project per the latest updated budget. This method involves measuring the proportion of the costs incurred in the work completed to date to the total costs envisaged, and recognising revenue in proportion to total expected revenue. Under this method, the proportion that contract costs incurred bear to the estimated total contract costs is used to determine the revenue to be recognised, by reference to the estimated margin for the entire term of the contract. As indicated above, this method is only applied to complex construction or service contracts with a fixed price (“lump sum”) in which it is not possible to break down the units produced and measure them.
II) Recognition of revenue from contract modifications, claims and disputes
Contract modifications are defined as changes in the scope of the work, other than changes envisaged in the original contract, that may result in a change in the revenue associated with that contract. Modifications to the initial contract require the customer’s technical and financial approval before billings can be issued and the amounts relating to the additional work can be collected. The Group does not recognise the revenue from such additional work until the customer’s approval has been obtained. In cases where the additional work has been approved but the corresponding change in price has not been determined, the requirement described below for variable consideration is applied: namely, to recognise revenue for an amount with respect to which it is highly probable that a significant reversal will not occur. The costs associated with these additional units or services performed are recognised when incurred, irrespective of whether or not the modification has been approved.
A claim is a request for payment or compensation from the customer (for example, for compensation, reimbursement of costs, or a legally compulsory inflation review) that is made directly to the customer. The method followed by the Group with respect to claims is to apply the method described above for modifications, when the claims are not covered by the contract, or the method used for variable consideration, when the claims are covered by the contract but need to be quantified.
A dispute is the result of a disconformity or rejection following a claim made to the customer under the contract, the resolution of which is dependent on a procedure conducted directly with the customer or a court or arbitration proceeding. Per the criteria followed by the Group, revenue relating to disputes in which the enforceability of the amount claimed is questioned is not recognised, and previously recognised revenue is derecognised, since the dispute demonstrates the absence of the customer’s approval of the work completed. If the customer only questions the price, revenue recognition is based on the criterion applied in cases of variable consideration discussed below.
Only in those cases in which there is a legal report confirming that the rights under dispute are clearly due and enforceable and that, therefore, at least the costs directly associated with the related service will be recovered, may revenue be recognised up to the limit of the amount of the costs incurred.
III) Variable consideration
If the consideration promised in a contract includes a variable amount, this amount is recognised only to the extent that it is highly probable that a significant reversal in the amount recognised will not occur when the uncertainty associated with the variable consideration is subsequently resolved.
IV) Statement of financial position balances relating to revenue recognition
Amounts to be billed for work performed/amounts billed in advance for construction work
Unlike the method used to recognise contract revenue, the amounts billed to the customer are based on achievement of the various milestones established in the contract and on acknowledgement thereof by the customer, which takes the form of a contractual document called “certificate of completion” or “work order”. Thus, the amounts recognised as revenue for a given year do not necessarily coincide with the amounts billed to or certified by the customer. In the case of contracts in which the goods or services transferred to the customer exceed the related amount billed or certified, the difference is recognised (as a contract asset) in an asset account called “Amounts to be Billed for Work Performed” under “Trade Receivables for Sales and Services”, whereas in contracts in which the goods or services transferred are lower than the amount billed to or certified by the customer, the difference is recognised (as a contract liability) in a liability account called “Amounts Billed in Advance for Construction Work” under “Current Trade and Other Payables”.
Bid costs and mobilisation costs
In addition to the aforementioned statement of financial position balances, the Group also recognises assets relating to the costs of obtaining a contract (bid costs) and to the costs incurred to fulfil a contract or setup costs (mobilisation costs) that are directly related to the principal contract, provided they will be recovered through performance of the contract. These balances are presented in a separate account under “Inventories” on the asset side of the consolidated statement of financial position (see Note 4.1).
Bid costs are only capitalised when they are directly related to a contract and it is probable that they will be recovered in the future and the contract has been awarded to the company or the company has been selected as the preferred bidder. Costs incurred that would have been incurred regardless of whether the contract was obtained are recognised as an expense, unless those costs are explicitly chargeable to the customer in any case (whether or not the contract is obtained). The capitalised costs are amortised on a systematic basis that is consistent with the transfer to the customer of the goods or services to which the asset relates.
Costs required to set up the contract, mobilisation costs, are capitalised provided that it is probable that they will be recovered in the future and that they do not include expenses that would normally have been incurred by the company if the contract had not been obtained. They are gradually recognised as an expense on the basis of the proportion of actual output to estimated output under each contract. If the above conditions are not met, these costs are taken directly to profit or loss.
V) Provisions relating to contracts with customers
The main provisions relating to contracts with customers are provisions for deferred expenses and for budgeted losses
- Provisions for deferred expenses. These provisions cover the expenses that will foreseeably arise on completion of a contract, such as those for the removal of construction machinery or dismantling costs, as well as the estimated repairs to be carried out within the guarantee period. These provisions relate to a present obligation stipulated in the contract that is based on the fact that in order to settle the obligation there will probably be an outflow of resources from the company the amount of which can be estimated reliably. Provisions are recognised on the basis of the best possible estimates of the total expenditure required to settle the obligations. They can be determined as a percentage of the total expected revenue from the contract if historical information on similar contracts is available.
The guarantee obligations included in this type of provisions are not considered to be a separate performance obligation unless the customer has the option of arranging the guarantee separately, and, accordingly, they are recognised as indicated in IAS 37 on provisions and contingent assets and liabilities. - Provisions for budgeted losses. These provisions are recognised as soon as it becomes evident that the total costs expected to be incurred in a contract exceed the total expected revenue from that contract. For the purpose of determining , if appropriate, the amount of the related provision, the criterion established in IAS 37.14 (b) is applied. Thus, the estimate of the total budget for the contract includes the expected revenue that is considered to be probable. This criterion is different from that established in IFRS 15, discussed above in Note 1.3.3.4, Revenue recognition, on the basis of which such revenue is only recognised to the extent that it is deemed to be highly probable. Also, if the total expected profit on a contract is less than that recognised under the aforementioned revenue recognition rules, the difference is recognised as a provision for losses.
VI) Financing component
In general, in order to calculate the price of a performance obligation, an implicit financing component is calculated, in those cases in which the period between when the entity transfers a promised good or service to a customer and when the customer will foreseeably pay for that good or service is more than one year. This component is accounted for as finance income.
With respect to performance obligations for which the period between when the entity transfers a promised good or service to the customer and when the customer pays for that good or service is less than one year, the Group applies the practical expedient permitted by IFRS 15 and does not adjust the promised amount of consideration for the effects of a significant financing component.
In those cases in which there is a contractual or legal right to charge late-payment interest owing to the delay in collection with respect to the contractually established periods, such interest is only recognised when it is highly probable that it will actually be collected.
VII) Specific revenue recognition criteria by segment
Construction business
As a general rule, a single performance obligation is identified for construction contracts owing to the high degree of integration and customisation of the various goods and services to provide a combined output that is transferred to the customer over time.
As discussed above, the Group has chosen as its preference the measured unit of work method (output method), which is applied provided that the progress of the work completed can be measured during the performance of the contract and that a price can be allocated to each unit of work.
Only in those contracts for which the unitary price of the units to be performed cannot be determined is it permitted to use the input method (stage of completion measured in terms of costs incurred).
Services business
There is no single contract type in the case of the Services business due to the considerable diversity of the services rendered. In general, the contracts involve various tasks and unit prices and the related revenue is recognised in the consolidated statement of profit or loss as the services are provided, based on the time elapsed, i.e. when the customer simultaneously receives and consumes the benefits provided by the entity’s performance of the service as the entity performs. This occurs for example in routine or recurring services such as facility management, street cleaning or waste collection services.
Certain contracts include different types of activities that are subject to fixed unit price tables for the services provided and which form part of the contract as a whole. In such contracts the customer requests each of the services by means of a work order, which is considered to be a separate performance obligation, and the associated revenue is recognised depending on the specific requirements established in the contract for the approval of the service.
In the case of complex long-term contracts involving the provision of several services that constitute separate performance obligations (construction, maintenance, operation, etc.), payment for which is made on a periodic basis and in which the price for those performance obligations is indicated in the contract or can be determined, revenue is recognised using the time elapsed method for the recurring services, whereas the stage of completion method is used for those more complex performance obligations for which it is not possible to allocate a price to each of the units of work performed.
Lastly, it should be noted that the revenue from certain contracts that fall within the scope of IFRIC 12 is recognised as described in Note 1.3.3.2.
Toll Road business
The arrangements included in this line of business are accounted for in accordance with IFRIC 12, which provides for the classification of the assets assigned to such arrangements on the basis of the intangible asset model and the financial asset model (bifurcated arrangements can also exist) (see Note 1.3.3.2).
The new IFRS 15, Revenue from Contracts with Customers does not give rise to a change with respect to the revenue recognition method used to date. In the case of concession arrangements accounted for using the intangible asset model, the customer is the user of the infrastructure and, therefore, each use made of the infrastructure by users is considered a performance obligation, and the related revenue is recognised at a point in time. In the case of concession arrangements accounted for using the financial asset model, in which the customer is the concession grantor, revenue recognition depends on the various services provided (e.g. operation or maintenance), which will be accounted for as different performance obligations, to which market prices have to be allocated. In those cases in which a stand-alone selling price is not directly observable, it is estimated on the basis of the best possible estimate, using the expected margin for that activity.
Airports business
In general, the services provided in this business are short-term services to customers (airline or airport users) for which regulated revenue is recognised at a point in time; therefore, there are no changes with respect to revenue recognition for this business. It should be noted that the revenue from certain contracts that fall within the scope of IFRIC 12 is recognised as described in Note 1.3.3.2.
Real estate business
The revenue from this business relates mainly to the sale of apartments, commercial premises and garage spaces, and is recognised when the buyer receives legal title to, and takes physical possession of, the asset. Each unit (apartment, etc.) is considered to be a separate performance obligation and the related revenue is recognised when the asset is legally and economically transferred to the buyer; this does not constitute any change in the revenue recognition method currently applied.
Energy distribution business
The contracts in this business involve a series of services that are substantially the same and have the same pattern of transfer to the customer. The monthly rate reflects the value of the services provided. Contracts of this kind have a single performance obligation that is satisfied over time and the related revenue is recognised by applying the output method.
1.3.4. Accounting estimates and judgements
In the consolidated financial statements for 2017 estimates were made to measure certain of the assets, liabilities, income, expenses and obligations reported herein. These estimates relate basically to the following:
- Estimates taken into consideration for the purpose of recognising revenue from contracts with customers (see Note 1.3.3.4), including most notably those associated with:
- determining whether enforceable rights exist, in order to recognise revenue;
- determining whether a contract modification has been approved;
- establishing whether the conditions for recognising revenue for variable consideration are met;
- recognising revenue in relation to a claim or a dispute;
- establishing whether the contract includes one or several performance obligations, and determining the price allocable to each of them;
- defining for each performance obligation the applicable method for recognising revenue over time, taking into account that, based on the accounting policy established by the Company, the preferred method is the “survey of performance completed to date” output method (schedule of values or based on time elapsed), and the “stage of completion measured in terms of the costs incurred” input model is applied in those cases in which the services provided are not routine and recurring services and in which the unit price of the units of work to be performed cannot be determined;
- in the case of contracts recognised using the survey of performance completed to date method, measuring the units completed and the price that can be allocated thereto;
- in the case of contracts recognised using the “percentage of completion method” input method, defining the costs incurred relative to total contract costs, and the expected profit margin for the contract;
- determining whether to capitalise bid costs and mobilisation costs;
- making estimates relating to the calculation of the provision for expected losses and deferred expenses.
- The assessment of possible legal contingencies (see Note 6.5, Contingent liabilities, contingent assets, obligations and commitments and Note 6.3, Provisions).
- The recognition for accounting purposes of the subordinated guaranteed hybrid bond (see disclosure on equity instruments in Note 5.1.2).
- The estimates for the selection of the accounting method to be applied in relation to the loss of control, as in the case of the Portuguese toll roads (see Note 1.3.2, Basis of consolidation).
- Estimates regarding the valuation of derivatives and the expected flows associated with them in order to determine the existence of hedging relationships (see Note 5.5, Derivative financial instruments at fair value).
- The assessment of possible impairment losses on certain assets (see Note 3.1, Goodwill and acquisitions, and Note 3.5, Investments in associates).
- Business performance projections that affect the estimates of the recoverability of tax assets (see Note 2.8 on tax matters).
- Estimates relating to the fair value of assets and liabilities acquired in the business combinations detailed in Note 1.1.3, Changes in the scope of consolidation.
- Estimates taking into account the future vehicle numbers on toll roads for the purpose of preparing financial information for toll roads pursuant to IFRIC 12 (see Note 3.3, Investments in infrastructure projects and Note 6.3, Provisions).
- The assumptions used in the actuarial calculation of pension and other obligations to employees (see Note 6.2, Pension plan deficit).
- The measurement of share award plans (see Note 6.7, Share-based payment).
Although these estimates were made on the basis of the best information available at 31 December 2017 on the events analysed, events that take place in the future might make it necessary to change these estimates. Changes in accounting estimates would be applied prospectively in accordance with the requirements of IAS 8.
1.3.5. Disclosures
It should also be noted that in preparing these consolidated financial statements the Group omitted any information or disclosures which, not requiring disclosure due to their qualitative importance, were considered not to be material in accordance with the concept of materiality defined in the IFRS Conceptual Framework.