4.4 INFORMATION ON CONSTRUCTION CONTRACTS AND OTHER CONTRACTS UNDER WHICH THE RELATED REVENUE AND COSTS ARE RECOGNISED BY REFERENCE TO THE STAGE OF COMPLETION

Contract revenue associated with construction contracts and certain services contracts is recognised by reference to the stage of completion pursuant to IAS 11, as described in Note 1.3.3. Summary of the main accounting policies.

As indicated in that Note, the difference between the revenue recognised and the amounts actually billed to the customer is analysed systematically on a contract-by-contract basis. If the amount billed is lower than the revenue recognised, the difference is recognised as an asset under “Trade Receivables for Sales and Services – Amounts to Be Billed for Work Performed” (see Note 4.2), whereas if the amount of revenue recognised is lower than the amount billed, a liability is recognised under “Current Trade and Other Payables – Amounts Billed in Advance for Construction Work”.

Also, in certain construction contracts “advances” are agreed upon that are paid by the customer when work is commenced on the contract, the balance of which is offset against the various progress billings as the contract work is performed (these balances are recognised under “Trade Payables” in liabilities in the consolidated statement of financial position – see Note 4.3a).

In contrast to the advances, in certain contracts the customer retains a portion of the price to be paid in each progress billing to guarantee the satisfaction of certain obligations under the contract. These “retentions” are not reimbursed until the contract is definitively settled (these balances are recognised under “Trade Receivables for Sales and Services” in assets in the consolidated statement of financial position (see Note 4.2).

Unlike “Amounts to Be Billed for Work Performed” and “Amounts Billed in Advance for Construction Work”, the “advances” and “retentions” are balances that will have an impact on future cash flows, since in the case of the “advances” a lower amount will be collected in the future as the advances are discounted from the progress billings, whereas the “retentions” will give rise to higher collections in the future, since the customer will reimburse the related amounts as and when the contract work is settled.

The detail of the amounts recognised in this connection at 31 December 2016 and 2015 is as follows:

(Millions of euros)

2015

Exchange rate effect

Changes in the scope of consolidation

Others

Transfers

2016

Amounts to be billed for works performed (Note 4.2. a)

775

-62

179

50

0

942

Amounts billed in advanced for construction work

-549

4

-94

0

75

-565

Contracts accounted for by reference to the stage of completion, net

226

-58

85

50

75

377

Retentions (Note 4.2. a)

75

2

19

9

0

105

Advances

-240

0

0

-50

0

-291

Amount net of advances and retentions

-165

2

19

-41

0

-186

The main impacts under this heading are due to the inclusion in the scope of consolidation of Broadspectrum, which represents an increase in “Amounts to Be Billed for Work Performed” (EUR 167 million), in “Amounts Billed in Advance for Construction Work” (EUR 83 million) and in “Retentions” (EUR 4 million).

Within “Amounts to be Billed for Work Performed”, three types of balances must be defined.

  • Balances relating to modifications and claims (see Note 1.3.3.4 for the definition), for approximately EUR 90 million, which have not yet been approved by the customer and on which revenue of EUR 23 million was recognised in 2016. These amounts were recognised as assets using the probability criteria established in IAS 11. As indicated in Note 1.3.1, since following the entry into force of the new revenue recognition standard, IFRS 15, customer approval is required, this amount will foreseeably be adjusted against reserves at the date of first-time application. The estimated impact on reserves arising from this adjustment is EUR 60 million, including the tax effect (section (ii) in the Note on IFRS 15).
  • Balances relating to contracts recognised by the input method. In this case, the revenue will depend on the advance on costs and the expected margin for the end of the contract. During the contract, the revenue recognised could differ from the amounts billing to the customer, but at the end, will be the same. The estimated balance is approximately EUR 230 million. A portion of these balances will be subject to adjustment due to the application of IFRS 15, arising from the identification of various performance obligations, the allocation of the price thereof and the change of revenue recognition method in certain contracts, as explained in Note 1.3.1. b). The estimated impact on reserves arising from these adjustments is approximately EUR 100 million, including the tax effect (sections (i) and (iii) in the Note on IFRS 15).
  • Remaining balance of amounts to be billed for work performed, amounting to approximately EUR 620 million, which would relate to the difference between the date the projects covered by the principal contract are performed and the date the customer is billed for them (progress billings). This figure, in respect of the annual billing figure assignable to these balances, is approximately equal to one month’s billings.